Reznor VPT Unit Installation Manual Manual de usuario

Busca en linea o descarga Manual de usuario para Radiadores Reznor VPT Unit Installation Manual. Reznor VPT Unit Installation Manual User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Model VPT
High/Low Burner/Control Box
with 20 - 70 ft Tube/Reflector Length
INSTALLATION / OPERATION / MAINTENANCE
Applies to: Model VPT 120V 60Hz
Gas-Fired, Tubular, Radiant,
Low-Intensity Infrared Heater
Part No. 270684
Vista de pagina 0
1 2 3 4 5 6 ... 39 40

Indice de contenidos

Pagina 1 - Part No. 270684

Model VPT High/Low Burner/Control Box with 20 - 70 ft Tube/Reflector Length INSTALLATION / OPERATION / MAINTENANCE Applies to: Model VPT 1

Pagina 2 - Introduction

10 Figure 7.a Vertical Venting. Figure 7.b Horizontal Venting. Figure 7.c Fresh Air Ducted Intake. Figure 7.d Wall Terminal Intake Kit. RADIANTTUB

Pagina 3 - WARNING:

11 1.8 Technical Details No of Injectors 1 Gas Connection ½” N.P.T Electrical Supply 120 volt 1 phase 60Hz Vent size (in) 4” or 6” (101mm or

Pagina 4

12 USA & CANADA Natural Gas 0- 2000 ft (0-610m) Size 60 80 100 125 150 170 200 Burner Orifice Plate Part No. 269941 269942 269943 26

Pagina 5 - 0° to 55°

13 Options * Not available on LP Gas 1 All standard units fitted with unvented vent, natural gas and aluminized reflectors. 2 1 off 180° ‘U’ ben

Pagina 6 - 3/4” CE4

14 2.2.3 Brackets There can be four types of brackets supplied with these heaters: 2.2.3.1 Brackets for Indoor heaters  Type ‘H’

Pagina 7 - 1.5 Electrical Connections

15 HFSFBurnerAssemblyReflectors2/0 GA CHAIN(TWISTED LINK, PLATED)NOTE.HOOKS ARE TOBE CLOSED UPAFTER ASSEMBLYEYE HOOKthe screw stop has butted up

Pagina 8 - Gas Valve

16 Slide the burner assembly onto the open tube end, ensuring it is fully engaged. Secure with set screws. For the purpose of unvented

Pagina 9 - 1.7 Fresh Air Intake

17 S20 S30 S40 S50 S60 S70 U20 U40 U60 Bends must be fitted at a distance of at least 50% of the total heat exchanger e.g. for a 60f

Pagina 10 - 36" (914mm) MIN CENTERS

18 Figure 9. Heater Assembly: Model Linear 60-S20. G6"-9" REFLECTOR OVERLAPFGHCOUPLERBURNERENDCAPS(OPTIONAL)10' 3" REFLECTORS

Pagina 11 - 1.8 Technical Details

19 Figure 10. Heater Assembly: Model Linear 60-S30, 80-S30, 100-S30 and 125-S30. G6" REFLECTOR OVERLAP6" REFLECTOR OVERLAPFG GHS FCOUPL

Pagina 12 - Technical Details continued

2 and servicing is undertaken on radiant tube heaters specified in these instructions, due care and attention is required to ensure that work

Pagina 13

20 Figure 11. Heater Assembly: Model Linear 60-S40, 80-S40, 100-S40, 125-S40 and 150-S40. GFG GHS SCOUPLER*(HIGH TEMP COUPLERMODELS 125/150)BURNE

Pagina 14 - 2. Assembly Instructions

21 Figure 12. Heater Assembly: Model Linear 125-S50, 150-S50, 170-S50 and 200-S50 GFGGHS FBURNERENDCAPS(OPTIONAL)6"4"51'6½" N

Pagina 15 - Reflectors

22 Figure 13. Heater Assembly: Model Linear 150-S60, 170-S60 and 200-S60. DETAILSLIDING REFLECTOR BRACKETDETAILFIXED REFLECTOR BRACKETREFLECTORTUB

Pagina 16

23 Figure 14. Heater Assembly: Model Linear 170-S70 and 200-S70. DETAILSLIDING REFLECTOR BRACKETDETAILFIXED REFLECTOR BRACKETREFLECTORTUBESTRAPRAD

Pagina 17

24 Figure 15. Heater Assembly: Model U tube 60-U20. FCOUPLERBURNERENDCAPS(OPTIONAL)6"4"10' 3" REFLECTORS TYPICAL OF 2DISTANCE

Pagina 18 - 2" MINIMUM

25 Figure 16. Heater Assembly: Model U tube 60-U40, 80-U40, 100-U40, 125-U40 and 150-U40. 6"-9" REFLECTOR OVERLAPSFCOUPLER*(HIGH TEMPCO

Pagina 19

26 3. Start Up Instructions. These appliances should be commissioned by a qualified mechanical contractor. 3.1 Tools Required. The following to

Pagina 20

27 Figure 17. Heater Assembly: Model U tube 150-U60, 170-U60 and 200-U60. 6"-9" REFLECTOR OVERLAPSFHT COUPLERBURNERENDCAPS(OPTIONAL)6&qu

Pagina 21

28 Switch off the power supply to the heating system. Disconnect ‘U’ tube manometer, then securely replace screw in pressure tes

Pagina 22 - COUPLERCOUPLER

29 Check installation has been carried out to these instructions. NO YES Ensure gas and electricity supplies are isolated. Disconnect gas hose from

Pagina 23

3 Structures, ANSI/NFPA 88A, or the Standard for Repair Garages, ANSI/NFPA 88B, or the Canadian Natural Gas and Propane Ins

Pagina 24 - 3' 3"

30 Small Flat Head Screwdriver 4. Servicing Instructions. These appliances should be serviced annually by a competent person to ensure

Pagina 25

31 4.3 Burner Removal Step 1: Isolate power and gas supplies. Step 2: Disconnect the external power/control connections. Step 3: Detach

Pagina 26 - 3. Start Up Instructions

32 4.5 Combustion Fan Servicing Step 1: Remove the four top lid screws to reveal the combustion fan shown below. Step 2: Disconnect the fan ca

Pagina 27

33 Step 4: Refit the electrode assembly and ensure the connections are secure to prevent incorrect sparking of the spark electrode

Pagina 28

34 270373 270498 Note: Any spare part components that are not approved by the manufacturer could invalidate the approval of the app

Pagina 29

35 6. Troubleshooting Guide. STARTEnsure gas & electricity supplies are enabled. Turn any external timer to call for heat (if fitted).Does the

Pagina 30 - 4. Servicing Instructions

36 Do the amber lights remain illuminated after 15 seconds?NOYESDoes the burner spark? YESNOCHECK: -1. Spark gap correct (7/64" ± 1/64"

Pagina 31

37 7. Replacing Parts. 7.1 Burner Controller Replacement Step 1: Remove the four screws securing the bottom access door. Step 2: Disco

Pagina 32

38 Step 5: Fit the new air pressure switch ensuring the tubes are connected as shown below. Step 6: Re-connect wiring. Step 7: Test product and

Pagina 33

39 MODEL Natural Gas Altitude Conversion Kit Propane Gas & Propane Altitude Conversion Kit Combustion Air inlet Kit Aluminized Steel End C

Pagina 34 - 5. Spare Parts

4 1.3 Clearance to Combustibles. Minimum clearance to combustibles are shown in Table 1 below. IMPORTANT: The stated clearance to combustibl

Pagina 35 - 6. Troubleshooting Guide

40 8. User & Operating Instructions. 1. This appliance must only be installed by qualified installer in accordance with the requirements of

Pagina 36

5 Figure 2 Clearance to Combustibles (Standard indoor reflectors). The minimum clearances to combustible materials are given in the tabl

Pagina 37 - 7. Replacing Parts

6 1.4 Gas Connection and Supply The gas connection on the heater is ½” N.P.T internal thread. Injector sizes and manifold pressure

Pagina 38

7 1.5 Electrical Connections This appliance must be electrically grounded Supply 120V 60Hz single phase. Standard heater 0.16HP. Current rating 1

Pagina 39 - 7.4 Optional Extra Kits

8 If any of the original wire as supplied with the appliance must be replaced, it must be replaced with wiring material having a temperature rating

Pagina 40

9 1.6 Vent Requirements and Details 1.6.1 Unvented units Heaters may be installed without a vent providing the governing building

Comentarios a estos manuales

Sin comentarios