6
WARNING:
Combustible air must not be drawn from a
contaminatedatmosphere.Excessiveexposure
to contaminated combustion air will result in
safetyandperformancerelatedproblems.
To maximize heat exchanger life, the combustion air
must be free of chemicals which form corrosive acidic
compounds in the combustion gases.
IMPORTANT NOTE:
Donotstoreanychemicalswithammableorcaustic
vaporsneartheventtermination.Someexamplesof
thesechemicalsare:
• CarbontetraChloride • Gasoline/Kerosene
• Cements,Glues,paintremovers,
varnishes,etC.
• haloGentyperefriGerants
• CleaninGsolvents • hydroChloriCaCid
• ChlorinebasedswimminGpool
ChemiCals
• masonryaCidwashinGmaterials
• Chlorinatedwaxes&Cleaners • permanentwavesolutions
• de-iCinGsaltsorChemiCals • watersofteninGChemiCals
VentTermination
This unit has been developed for use with a combination
heat exchanger condensate drain and venting system
designed to operate only with this type of system.
Condensate Drain and Vent Kits are available for purchase
as accessory items.
Horizontal ground mount applications can use P/N-922323
to attach the 13.25” x 2” PVC pipe within the control area of
this unit. Rooftop mount applications can use the downflow
condensate drain / vent kit (P/N-922485).
If Nordyne kits are not being used, see Appendix on page
43 or page 45 for your specific application.
WARNING:
This unit is intended for outdoor installation
only.Thisunitmustbeventedtotheoutdoors.
Noadditionalventingshallbeused.Donotvent
theunitthroughaconventionalventingsystem.
The vent and drain assembly must be installed to
assureproperoperationoftheunit.Figure 2 shows the
proper installation of the vent and drain assembly for both
horizontal and downflow applications. The fasteners used
to secure the vent and drain assembly have been included
in the kit. The following list summarizes the requirements
forthelocationoftheventsystemtermination:
• Thelocationoftheventterminationmustbeconsistent
withtheNationalFuelGasCode(ANSIZ223.1)orCAN/
CGA-B149 Installation Codes.
• The vent termination must be located at least 4 feet
horizontally from any electric meters, gas meters,
regulators, and relief equipment.
HORIZONTAL GROUND MOUNT
Combined condensate
Drain / Vent System
ROOF MOUNTED UNIT
(ROOF CURB AND ROOF NOT SHOWN)
2” PVC x 22.5 Degree Elbow
& 1/4” Mesh Screen
Figure2.HeatExchangerCondensateDrain
&VentAssembly
• The vent terminationmustbelocatedatleast3feet
above any forced air inlet located within 10 feet.
• The vent terminationmustbelocatedatleast4feet
below, 4 feet horizontally from, or 1 foot above any
door, window, or gravity air inlet into any building.
• Theunitshouldbeinstalledinawaythatpreventsany
obstruction of the vent termination during accumulating
snow.
• Verify exhaust gases will not impinge on windows
or building surfaces, which may be compromised or
damaged by condensation.
• Donotinstalltheunitsuchthatexhaustfromthevent
termination is directed into window wells, stairwells,
under decks, or in alcoves or similarly recessed areas.