Reznor UDAP-CV with option AV6 Option - Installation - Co Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 8
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
Form I-UD-V-CV, P/N195677R5, Page 8
www.ReznorHVAC.com
(800) 695-1901
©2014 Reznor, LLC. All rights reserved.
Trademark Note: Reznor
®
, T-CORE
, and V3
®
are registered in at least the United States.
0514 Form I-UD-V-CV (Version A.4)
3.0 SECTION 2 -
Requirements
and
Instructions
for Category
I Common
Venting of a
Model UDAP-
CV (cont’d)
3.5 SECTION 2 - Vent Terminal
The vent terminal should be a minimum of six feet (1.8M) from adjoining build-
ings. The vent terminal should be six inches (152mm) higher than the antici-
pated snow depth but no less than two feet (610mm) above the roof. Where
the vent extends through the roof, a clearance thimble is required when the
ue pipe extends through combustible materials; follow the requirements of the
double-wall pipe manufacturer.
Terminate with a Reznor Option CC1 vent cap.
3.6 SECTION 2 - Clearance to Combustibles
Maintain 6 inches (152 mm) clearance between a single-wall vent pipe and
combustibles.
For Type B double-wall vent pipe, follow the pipe manufacturer’s recommenda-
tions for clearance to combustibles.
Vista de pagina 7
1 2 3 4 5 6 7 8

Comentarios a estos manuales

Sin comentarios